Hold the pressure the network needs, and no more

Pressure that runs higher than it has to costs energy, wears the network and turns small defects into bursts. You can only manage it where you can see it.

A pressure-reducing valve in a chamber
PRESSURE-REDUCING VALVE
01 — WHAT TO MEASURE

Both sides of the control point, and the critical point beyond it.

Inlet and outlet at pressure-reducing valves and regulator stations, and the point in the zone where pressure is lowest under peak demand. Together they show whether the setting is right for the network as it behaves today.

PRV inlet

What the network upstream is delivering to the control point.

PRV outlet

What the valve is actually setting, across the whole day.

The critical point

Where pressure is lowest under peak demand — the constraint that matters.

Flow, where there is a meter

So pressure can be read against demand rather than in isolation.

02 — HOW IT’S SET UP

A typical configuration.

CHAMBER PRV CX-LOG1.1 multi channel INLETOUTLET 4G Either side of the valveWhat arrives, and what the valve is actually setting.And the point beyondPressure at its lowest under peak demand.
CONTROL POINT AND CRITICAL POINT, MEASURED TOGETHER
01Cx-Log1.1 with the internal 0–20 bar transducer at the control point; a second unit at the critical point.
02Sampling at 5 to 15 minutes to catch peaks and overnight lows.
03Maximum and minimum alarms either side of the operating band.
04Flow on the same device where a meter is available, so pressure can be read against demand.
03 — WHAT YOU SEE

In CLog.

Pressure profiles across the day, before and after a setting change, with the critical point beside the control point. Enough to justify a change and to show what it achieved.

Set with evidence

A profile of the network as it behaves today, not as it was designed.

Fewer bursts

Shaving avoidable pressure takes stress off the mains that fail first.

Less energy

Pumping to a pressure the network does not need is the easiest cost to stop paying.

Put a number on your pressure.

Tell us the control point and the critical point, and we will scope what it takes to see both.